🚧DRIVEWAY CULVERT SPECIALISTS

Culvert Installation Packages

Professional driveway culvert installation with permit handling. From simple residential to FDOT-compliant state road access.

Every package includes:

HDPE culvert pipe
Fill material
Professional installation
1-year warranty
📍

Where's the driveway?

Optional - See your property and help us plan access

Our Installation Process

Click to see exactly what we do

No Permit Required

Install immediately - no waiting for permits

No Permit Required

12" Residential Culvert

Pipe:12" HDPE
Fill:8 yards
Timeline:1-2 days
Permit:Not required

Perfect for light residential driveways with minimal runoff

$1,397
MOST POPULAR
No Permit Required

15" Residential Culvert

Pipe:15" HDPE
Fill:10 yards
Timeline:1-2 days
Permit:Not required

Most popular residential size - handles moderate drainage

$1,597
No Permit Required

18" Residential Culvert

Pipe:18" HDPE
Fill:12 yards
Timeline:2-3 days
Permit:Not required

Large residential culvert for higher flow areas

$1,897
🏛️

County Permit

We handle all county permit paperwork

🏛️County Permit

15" County Permit Package

Pipe:15" HDPE
Fill:10 yards
Timeline:2-4 weeks
Permit:✓ Included

Standard county road access with permit handling

$2,097
MOST POPULAR
🏛️County Permit

18" County Permit Package

Pipe:18" HDPE
Fill:12 yards
Timeline:2-4 weeks
Permit:✓ Included

Popular county package for agricultural and rural properties

$2,397
🏛️County Permit

24" County Permit Package

Pipe:24" HDPE
Fill:15 yards
Timeline:2-4 weeks
Permit:✓ Included

Heavy-duty county access for high drainage requirements

$2,897
🏙️

City Permit

Full city permit management included

🏙️City Permit

15" City Permit Package

Pipe:15" HDPE
Fill:10 yards
Timeline:3-6 weeks
Permit:✓ Included

City-approved installation with full permit management

$2,397
MOST POPULAR
🏙️City Permit

18" City Permit Package

Pipe:18" HDPE
Fill:12 yards
Timeline:3-6 weeks
Permit:✓ Included

Standard city culvert with engineering review included

$2,697
🏙️City Permit

24" City Permit Package

Pipe:24" HDPE
Fill:15 yards
Timeline:3-6 weeks
Permit:✓ Included

Large city culvert - commercial grade drainage capacity

$3,297
🛣️

FDOT (State Road)

State road access with DOT compliance

🛣️FDOT (State Road)

18" FDOT Package

Pipe:18" HDPE
Fill:15 yards
Timeline:6-12 weeks
Permit:✓ Included

State road access - full FDOT permit & engineering

$3,897
MOST POPULAR
🛣️FDOT (State Road)

24" FDOT Package

Pipe:24" HDPE
Fill:20 yards
Timeline:6-12 weeks
Permit:✓ Included

Heavy-duty state road access with full compliance

$4,897

Add-Ons & Upgrades

Enhance your culvert installation

🔧Materials

Pipe Extension (+10ft)

Extend your culvert pipe for wider driveways or ditches

$297

Extra Fill (+10 yards)

Additional fill material for grade adjustments

$397

Flared End Section

Improves water flow and reduces erosion at pipe ends

$247

Overflow Grate

Surface grate for additional drainage capacity

$247

Finishing

Premium Grading

Precision grading for smooth driveway transition

$497

Sod Restoration

Professional sod installation around work area

$297

Concrete Driveway Apron

Poured concrete apron for clean road transition

$1,400

Culvert Marking Posts

Reflective markers for visibility and mowing safety

$97

🛡️Protection

Erosion Control Mat

Prevents washout during heavy rain events

$197

Rip Rap (per side)

Large stone for erosion control and bank stabilization

$347

📋Permits & Plans

Survey & Staking

Professional survey to verify property lines and grades

$397

Expedited Permit Processing

Rush processing - cuts wait time in half

$497

Annual Maintenance Plan

Yearly inspection, cleaning, and minor repairs

$197

5-Year Warranty Extension

Extended coverage beyond standard 1-year warranty

$497

Frequently Asked Questions

What size culvert do I need?

Most residential driveways need 15" pipes. Larger properties or areas with significant drainage may require 18" or 24". We'll assess your site and recommend the right size.

Do I need a permit?

It depends on your location. Private property with no public road access typically doesn't need permits. County/city roads require permits - we handle all the paperwork.

How long does installation take?

Physical installation is typically 1-3 days. The main variable is permit processing - county permits take 2-4 weeks, city permits 3-6 weeks, FDOT 6-12 weeks.

What's included in the fill?

Each package includes the specified yards of Class II fill material, properly compacted. This covers the pipe and creates a drivable surface. Extra fill is available as an add-on.

Need a custom quote?

For complex installations, multiple culverts, or commercial projects, give us a call for a custom estimate.

(386) 266-2980