Culvert Installation Packages
Professional driveway culvert installation with permit handling. From simple residential to FDOT-compliant state road access.
Every package includes:
Where's the driveway?
Optional - See your property and help us plan access
Our Installation Process
Click to see exactly what we do
No Permit Required
Install immediately - no waiting for permits
12" Residential Culvert
Perfect for light residential driveways with minimal runoff
15" Residential Culvert
Most popular residential size - handles moderate drainage
18" Residential Culvert
Large residential culvert for higher flow areas
County Permit
We handle all county permit paperwork
15" County Permit Package
Standard county road access with permit handling
18" County Permit Package
Popular county package for agricultural and rural properties
24" County Permit Package
Heavy-duty county access for high drainage requirements
City Permit
Full city permit management included
15" City Permit Package
City-approved installation with full permit management
18" City Permit Package
Standard city culvert with engineering review included
24" City Permit Package
Large city culvert - commercial grade drainage capacity
FDOT (State Road)
State road access with DOT compliance
18" FDOT Package
State road access - full FDOT permit & engineering
24" FDOT Package
Heavy-duty state road access with full compliance
Add-Ons & Upgrades
Enhance your culvert installation
🔧Materials
Pipe Extension (+10ft)
Extend your culvert pipe for wider driveways or ditches
Extra Fill (+10 yards)
Additional fill material for grade adjustments
Flared End Section
Improves water flow and reduces erosion at pipe ends
Overflow Grate
Surface grate for additional drainage capacity
✨Finishing
Premium Grading
Precision grading for smooth driveway transition
Sod Restoration
Professional sod installation around work area
Concrete Driveway Apron
Poured concrete apron for clean road transition
Culvert Marking Posts
Reflective markers for visibility and mowing safety
🛡️Protection
Erosion Control Mat
Prevents washout during heavy rain events
Rip Rap (per side)
Large stone for erosion control and bank stabilization
📋Permits & Plans
Survey & Staking
Professional survey to verify property lines and grades
Expedited Permit Processing
Rush processing - cuts wait time in half
Annual Maintenance Plan
Yearly inspection, cleaning, and minor repairs
5-Year Warranty Extension
Extended coverage beyond standard 1-year warranty
Frequently Asked Questions
What size culvert do I need?
Most residential driveways need 15" pipes. Larger properties or areas with significant drainage may require 18" or 24". We'll assess your site and recommend the right size.
Do I need a permit?
It depends on your location. Private property with no public road access typically doesn't need permits. County/city roads require permits - we handle all the paperwork.
How long does installation take?
Physical installation is typically 1-3 days. The main variable is permit processing - county permits take 2-4 weeks, city permits 3-6 weeks, FDOT 6-12 weeks.
What's included in the fill?
Each package includes the specified yards of Class II fill material, properly compacted. This covers the pipe and creates a drivable surface. Extra fill is available as an add-on.
Need a custom quote?
For complex installations, multiple culverts, or commercial projects, give us a call for a custom estimate.
(386) 266-2980